Liam Killingback
Published 23 November 2026 · Updated 23 November 2026
An owner-built home carries sale obligations that differ by state: NSW requires a consumer warning in the contract, Victoria a defects report under six months old, Queensland a signed notice before the contract. MatterFirst, a legal practice management platform for Australian law firms, records matters in all eight jurisdictions and calculates those dates from the rule that creates them.
Nothing on a title search tells you how to handle an owner-built home. A vendor mentions in passing that they "did the extension themselves", and a routine residential sale becomes a file with a statutory precondition attached. In most states that precondition has to be met before the contract is signed, not before settlement, so it has to be caught at the first conference rather than at the first requisition.
The rules are not harmonised. They differ in what triggers them, how long the exposure runs, what the vendor has to produce, and what happens to the contract when the vendor produces nothing. All figures below were checked against the cited pages on 23 November 2026. Check them again before advising on a live matter, because thresholds move.
What triggers the obligation in each jurisdiction
| Jurisdiction | Trigger period | What the vendor has to produce | Source |
|---|---|---|---|
| NSW | Sale within 7 years and 6 months after the owner-builder permit was issued | A consumer warning in the contract for sale stating that an owner-builder permit was issued in relation to the land, and the date it was issued | NSW Government |
| VIC | Sale within 6 years and 6 months of completing the work | A defects inspection report from a registered building practitioner covering all the work regardless of value, not more than six months old, plus domestic building insurance for work over $16,000 | Consumer Affairs Victoria |
| QLD | Sale within 6 years of finishing the owner-builder project | A notice given to the buyer before the contract of sale is signed, in two copies, one signed and returned by the buyer | QBCC |
| WA | Sale within 7 years from the date the building permit was issued | Home indemnity insurance under the Home Building Contracts Act 1991, covering the purchaser and later owners for the balance of the seven years | WA Government |
| SA | On sale, with no fixed window stated in the published guidance | Disclosure of whether building indemnity insurance is in place | SA Government |
| TAS | No sale-stage notice obligation in the published material | Nothing specific on sale; the statutory warranties pass to the purchaser by force of statute | Residential Building Work Contracts and Dispute Resolution Act 2016 s 31(3) |
| ACT | No sale-stage notice obligation in the Act | Nothing specific on sale; the occupancy certificate must state that the warranty and insurance part may not apply | Building Act 2004 (ACT) ss 73, 87 |
| NT | Obligations continue after sale | A fidelity fund certificate obtained before the building permit issued; rectification exposure for up to six years if the property is sold | NT Government |
New South Wales: a warning in the contract, and a voidable contract without it
The NSW obligation is the lightest to satisfy and the easiest to miss, because it is a form of words rather than a document. Where the sale happens within seven years and six months after an owner-builder permit was issued, the contract has to carry a statement that an owner-builder permit was issued in relation to the land, with the date of issue. If the warning is absent, NSW Government guidance says the purchaser can void the contract before settlement.
Two points follow. The clock runs from the date the permit issued, not from completion, so the permit date is what you have to find and record. And home building compensation cover is no longer available for owner-builder work, so there is no insurance certificate to chase. The warning is the whole obligation.
Victoria: a report with a shelf life
Victoria asks for the most work. On a sale within six years and six months of completing the work, the owner-builder needs a defects inspection report from a registered building practitioner, and Consumer Affairs Victoria states that it must cover all the work regardless of value and be not more than six months old. Where the work is over $16,000, domestic building insurance is also required.
The six-month shelf life is the trap. A report obtained when the vendor first thought about selling is often stale by the time a contract is signed, and a stale report is not a report. That is a date to calculate from the report, not from the campaign.
Queensland: a notice, signed, before the contract
Queensland puts the obligation squarely before signing. The QBCC states that where an owner-builder project was finished in the last six years, the seller must give the buyer a notice before the contract of sale is signed, in two copies, one of which the buyer signs and returns on or before signing. The notice has to set out the work, name the owner-builder permit holder, confirm the work was performed under an owner-builder permit, and warn that it is not covered by QBCC insurance.
The consequence of not giving it is the sharpest in the country: the seller is then treated as having warranted that the work was properly carried out. The QBCC also notes the owner-builder notation stays on the title for seven years, which is why a title search can flag what the vendor has not mentioned.
Western Australia: insurance, or an offence
Western Australia makes it an insurance question with a penalty attached. Per the WA Government, an owner-builder who sells within seven years from the date the building permit was issued must hold home indemnity insurance under the Home Building Contracts Act 1991, covering the purchaser and later owners for the balance of that seven-year period. Selling within seven years without it is an offence carrying a $10,000 penalty.
South Australia: disclose the position, because the vendor could not insure it
South Australia inverts the logic. SA Government guidance states that you cannot take out building indemnity insurance for building work you carry out yourself, and that when you sell the property you must disclose whether indemnity insurance is in place. So the disclosure will often be a disclosure that there is none. The same guidance puts the threshold for building indemnity insurance at domestic building work requiring approval and costing $20,000 or more, and notes that defective works claims can usually be made up to five years from completion.
Tasmania and the ACT: nothing to serve, which is its own risk
Neither jurisdiction imposes a sale-stage notice of the NSW, Victorian or Queensland kind, and that absence changes what the file should contain rather than removing the issue.
In Tasmania, section 31(3) of the Residential Building Work Contracts and Dispute Resolution Act 2016 gives a purchaser of a residential building where an owner builder did the work the benefit of the statutory warranties, as if the owner builder had done it for them under a contract. Section 32(1) requires proceedings for breach to start within six years after practical completion, so the dated exposure runs from practical completion.
The ACT runs the other way. Section 87(b) of the Building Act 2004 (ACT) provides that part 6, covering residential building work warranties, conditions and insurance, does not apply to work in relation to which an owner-builders licence has been granted, and section 73 requires the registrar's certificate for that work to state that part 6 may not apply. For a purchaser's adviser, that statement on the certificate is the signal to slow down.
What the file has to be able to prove, years later
Each of these obligations is proved by a date and a document, and the dates are not the ones a conveyancing file normally carries.
- The permit date, not the completion date. NSW and WA run from the date the permit issued; Victoria and Queensland from completion. A file recording only one cannot answer both questions.
- The age of the report at signing. A Victorian defects report has a six-month life, so the diary entry that matters is its expiry, not its issue date.
- Service, not possession. Queensland's evidence is the copy the buyer signed and returned, not the file copy.
- The permit holder's identity. The Queensland notice must name the permit holder, who is somebody else where the vendor bought from the owner-builder.
How MatterFirst handles this
MatterFirst is a legal practice management platform for Australian law firms, built by North Cape Technology in Melbourne. Three parts of it bear on an owner-builder sale.
The first is jurisdiction. Matters can be recorded in all eight Australian jurisdictions, and the obligations and limitation dates engine calculates key dates from rules that cite the governing statute, in the way a limitation rule cites the Limitation Act 1969 (NSW) s 14(1). A trigger of "within six years and six months of completion" becomes a date calculated from a recorded fact rather than a note in a file, and it syncs to the calendar through matter management.
The second is the disclosure document. Automations run trigger, condition and action rules over routine steps, and generating a document can be a step in a workflow. The generation engine is deterministic by default: a firm defines its own document types from merge fields, matter data projections and clause library entries, with AI only where a section genuinely calls for synthesis. A Queensland owner-builder notice should be assembled from recorded matter data and a fixed clause, never drafted fresh.
The third is evidence. Generated documents file on the matter and can be sent by email or shared to the client portal, so the record of what went to whom, and when, sits on the matter rather than in sent items. Where the vendor hands over a permit, report or certificate as a PDF, Document AI extracts the key terms into the workflow, and custom extraction rules let a firm define its own fields, such as a permit issue date.
One stated limit: the trust accounting compliance review workflow covers NSW, VIC, QLD and WA. Data and AI processing run in the AWS region the firm chooses, Sydney by default, as set out on the security page.
How the main Australian platforms compare
Verified from each vendor's own public pages on 23 November 2026. Where a vendor does not publish a fact, the cell says so rather than guessing.
| Platform | Pricing model published | Published entry price | Published Australian coverage relevant to a conveyancing file | Document assembly approach as published |
|---|---|---|---|---|
| MatterFirst | Per workspace, users included | $199 AUD per month (Solo) | Matters in all eight jurisdictions; trust compliance review workflow covers NSW, VIC, QLD and WA | Firm-defined document types built from sections that are deterministic by default, with AI only where a section calls for synthesis |
| LEAP | Not published on its conveyancing page | Not published | Pre-configured conveyancing and property matter types; settlement adjustments described as available for every state and territory; PEXA workspace creation via its InfoTrack integration | Forms and precedents auto-populated from matter data, with By Lawyers precedent content |
| Smokeball | Per user per month | From $59 per user per month (Bill plan) | Conveyancing listed as a practice area; trust accounting and reporting included from the entry plan | Advanced document automation and automated precedents listed from the Grow plan |
| Actionstep | Per user, annual commitment, plus implementation | Not published; each plan shows a request-pricing action | Trust accounting and client accounting listed under its ANZ practice management features | Advanced document automation included in the Intelligence package, an add-on below that |
| Clio | Not verified | Not verified | Not verified | Not verified |
Sources: MatterFirst pricing, LEAP conveyancing, Smokeball pricing, Actionstep pricing. Clio's Australian pages could not be retrieved on the day of writing, so no Clio cell is stated.
Who this suits, and who it does not
MatterFirst suits Australian firms of roughly two to twenty fee earners running residential conveyancing across more than one state, that want the state-specific date and disclosure logic held by the system rather than by whoever has done the most sales. It suits firms that would rather a conveyancing notice came out of a deterministic template than out of a model.
It suits a firm less well if the state-based trust compliance review matters and the firm practises in SA, TAS, ACT or NT, because that workflow covers NSW, VIC, QLD and WA. It also suits less well where the day-to-day depends on a provider that is not yet connectable: Xero, Stripe, Microsoft 365 and Google Workspace connect self-serve, and anything else goes through the documented REST API with webhooks.
Pricing is per workspace rather than per user, from $199 per month with users included, and every paid plan includes the client portal, automations and an AI balance in Australian dollars that metered AI work draws down. Deterministic work, such as generating a document with no AI sections, draws down nothing. The figures are on the pricing page and the metering detail on the AI pricing page. A firm leaving FilePro or LawMaster can start with the migration assessment, and the questions worth putting to any vendor are in the evaluation checklist.
FAQ
Does MatterFirst track the Victorian owner-builder report expiry date? It can. The obligations and limitation dates engine calculates key dates from recorded matter facts, cites the governing rule, and syncs those dates to the calendar.
What happens in NSW if the owner-builder warning is left out of the contract? NSW Government guidance says the purchaser can void the contract before settlement. The warning applies to a sale within seven years and six months after the permit issued.
Does the Queensland owner-builder notice have to be signed before the contract? Yes. The QBCC says two copies go to the buyer, who signs one and returns it on or before signing the contract.
Can a South Australian owner-builder take out building indemnity insurance for their own work? No. SA Government guidance states you cannot take out building indemnity insurance if you are carrying out the work yourself, and that you must disclose on sale whether indemnity insurance is in place.
Which systems does MatterFirst connect to today? Xero, Stripe, Microsoft 365 and Google Workspace connect self-serve. Anything beyond those goes through the documented REST API with webhooks.
Where is a MatterFirst firm's data stored? Data and AI processing are hosted in the AWS region the firm chooses, Sydney by default for Australian firms.
The short version
Find the permit date and the completion date at the first conference, because every jurisdiction's clock runs from one or the other. In NSW, put the warning in the contract. In Victoria, get a defects report still under six months old on the day of signing, plus insurance where the work exceeded $16,000. In Queensland, serve the notice in two copies and get one back before signing. In WA, confirm the home indemnity insurance exists. In SA, disclose the insurance position, usually that there is none. In Tasmania and the ACT there is nothing to serve, so the purchaser's adviser carries the work.
None of that is hard. It is only hard to remember, which is a reason to hold it as a dated rule in the system rather than as knowledge in a person.
Related posts
First home buyer duty concessions in each Australian state and territory: what the conveyancing file has to establish
First home buyer duty relief differs in every Australian state and territory, and the concession turns on facts about the buyer that a revenue office can test years later. The current thresholds, occupancy deadlines and the evidence a conveyancing file has to carry.
GuidesSelling a tenanted residential property in Australia: the notice period in each state and what the file has to carry
A sale does not end a tenancy: the buyer becomes the landlord on settlement. The minimum notice for a sale-related termination runs from 30 days in NSW to 90 days in Victoria, and in six jurisdictions a fixed term sets the floor for the settlement date. The notice periods, the evidence each notice must carry, the access rules during the campaign, and what the settlement statement adjusts.